Turret has been modeled and awaiting the zimmerit and mg mount, which I'll be doing last of all. Turret was filed down and some of the bad joins will be filled when I apply the paste. The stowage box at the rear of the turret was a little tricky in getting the curve of the box, but the usual trick of pouring boiling water over the platicard, and quickly cooling worked.I used pliers to squeeze the piece to the correct bend angle, tagging the piece to the supports with superglue, to then use plastic glue and blocks to get the most contact with the rear plate.
No comments:
Post a Comment